The transfer of patients to the Ripoll building ends
https://www.tauli.cat/actualitat/wp-content/uploads/2022/06/20220616_103358-01-1200x675.jpeg
1080
608
Parc Taulí current affairs
Parc Taulí current affairs
https://www.tauli.cat/actualitat/wp-content/uploads/2022/06/20220616_103358-01-1200x675.jpeg
- No Comments
On Tuesday, June 14, the transfer of the first patients who already occupy the 1st floor began to the new Ripoll building. These patients came from the semi-critical and short-stay areas of the Taulí building. This move will allow the remodeling of the first and fourth floors of the Taulí, which will be closed during the summer due to works to improve accessibility (replacement of bathtubs with shower trays).
On Wednesday 15 and Thursday 16 June, the transfer was completed with the patients of surgical hospitalization on the 2nd floor of Ripoll, and with the patients of hospitalization of Pediatrics, who have also opened the 3rd floor.
Many thanks to all the professionals who made it possible!
Leave a Reply